Welcome to the  
AACES-2 Project
Australian Airborne Cal/val Experiment for SMOS
Home page
Google Earth (KML file)
Workplan SMOS
AMSR-E
WindSat
ASCAT
PALSAR
ASAR MODIS
MTSAT-1R
ASTER
Landsat
CHRIS
AVNIR-2 PLMR data
Thermal Infrared data
Multi-Spectral data Monitoring stations
Soil moisture sampling
Vegetation sampling Campaign shapefiles
DEM
Land use
Climate data
Soil classification
Soil water capacity
Soil texture analysis
AACES homepage
Moisturemap homepage

Phased Array L-band Synthetic Aperture Radar (PALSAR)

Source: http://spacespin.org, access on 28th, Apr. 2010

Source: http://www.eorc.jaxa.jp, access on 28th, Apr. 2010 (modified)


Source: http://www.alos-restec.jp, access on 28th, Apr. 2010

The PALSAR is an active microwave sensor aboard the Advance Land Observing Satellite (ALOS). The sensor operates at L-band with HH and VV polarisation (HV and VH polarisations are optional). The sensor is beam steerable in elevation and the ScanSAR mode allows obtaining a wider swath than conventional SARs. ALOS was launched in 2004 into a sun-synchronous orbit at the altitude of 700km, providing a spatial resolution of 20m for the fine resolution mode (swath width of 70km) and 100m for the ScanSAR mode (swath width of 360km). The repeat cycle is 46 days and the local time at descending node is about 10:30am. PALSAR data can be downloaded from ERSDAC.


Mission PALSAR
Sensor Phased Array L-band Synthetic Aperture Radar (PALSAR)
Spacecraft Advance Land Observing Satellite (ALOS)
Launch date 24th, Jan. 2006
Design life 3 - 5 years
Orbit Sun-Synchronous Sub-Recurrent, at an angle of 98.16°, at altitude of 691.65km (at equator).
Spacecraft operations control centre JAXA and JAROS
Center frequency (GHz) 1.27 (L-band)
Mode Fine ScanSAR Polarimetric (Experimental mode)
Band width (MHz) 28 14 14, 28 14
Polarisation HH or VV HH+HV or VV+VH HH or VV HH+HV+VV+VH
Incidence angle (°) 8 - 60 8 - 60 18 - 43 8 - 30
Swath (km) 40 - 70 40 - 70 250 - 350 20 - 65
Spatial resolution (m) 7 - 44 14 - 88 100 (multi-look) 24 - 89
Bit length 5 bits 5 bits 5 bits 3 or 5 bits
Radiometric accuracy scene: 1dB or orbit: 1.5dB
Temporal resolution Repeat Cycle: 46 days, Sub Cycle: 2 days

PALSAR full beam mode product overpass time

PALSAR coverage for the Murrumbidgee Catchment during the AACES-2 campaign has been calculated by a Fortran program based on NORAD data for 6th, Nov. 2009, and is summarized in the table below. Date and time are in UTC. Aircraft flights were assumed to be conducted at 7:45 for descending overpass and 20:35 for ascending overpass.

  : Transect flight within 6 hours   : Patch flight within 6 hours
● : Fully covered ○ : Partially covered

UTC Date Start UTC Time Duration (s) Flight Patch
1 2 3 4 5 6 7 8 9 10
2010/1/18 23:51:03 145   ● ● ● ● ● ● ● ● ● ●
2010/1/19 13:29:56 160   ● ● ● ● ● ● ● ● ● ●
2010/1/20 23:34:16 122             ○ ○ ● ● ●
2010/1/21 13:12:53 140         ○ ● ● ● ● ● ●
2010/1/22 0:14:23 135 P01 ● ● ● ● ● ○ ○      
2010/1/22 13:53:43 112   ● ● ● ○            
2010/1/23 23:57:17 144   ● ● ● ● ● ● ● ● ● ●
2010/1/24 13:36:17 156   ● ● ● ● ● ● ● ● ● ●
2010/1/25 23:40:17 140         ○ ● ● ● ● ● ●
2010/1/26 13:19:01 151   ○ ● ● ● ● ● ● ● ● ●
2010/1/27 0:20:45 111   ● ● ○ ○            
2010/1/27 14:00:22 45   ○                  
2010/1/27 23:24:20 30 P03                   ○
2010/1/28 13:02:28 91                   ○ ●
2010/1/29 0:03:29 145   ● ● ● ● ● ● ● ● ● ○
2010/1/29 13:42:37 147   ● ● ● ● ● ● ● ○ ○  
2010/1/30 23:46:25 144   ○ ○ ● ● ● ● ● ● ● ●
2010/1/31 13:25:14 158   ● ● ● ● ● ● ● ● ● ●
2010/2/1 0:27:21 52   ○                  
2010/2/1 23:29:52 100 T01               ○ ○ ●
2010/2/2 13:08:21 126             ○ ● ● ● ●
2010/2/3 0:09:42 142   ● ● ● ● ● ● ● ○    
2010/2/3 13:48:58 129   ● ● ● ● ● ○        
2010/2/4 23:52:36 145   ● ● ● ● ● ● ● ● ● ●
2010/2/5 13:31:32 160   ● ● ● ● ● ● ● ● ● ●
2010/2/6 23:35:44 130 P05         ○ ○ ● ● ● ●
2010/2/7 13:14:23 145       ○ ● ● ● ● ● ● ●
2010/2/8 0:15:58 129   ● ● ● ● ○ ○        
2010/2/8 13:55:21 98   ● ● ○              
2010/2/9 23:58:49 144 P07 ● ● ● ● ● ● ● ● ● ●
2010/2/10 13:37:51 153   ● ● ● ● ● ● ● ● ● ○
2010/2/11 23:41:46 142 P06     ○ ○ ● ● ● ● ● ●
2010/2/12 13:20:32 153   ● ● ● ● ● ● ● ● ● ●
2010/2/13 0:22:20 100   ● ○ ○              
2010/2/13 23:25:33 62                     ○
2010/2/14 13:03:51 105                 ○ ● ●
2010/2/15 0:04:59 145 P08 ● ● ● ● ● ● ● ● ○ ○
2010/2/15 13:44:10 142   ● ● ● ● ● ● ● ○    
2010/2/16 23:47:53 146   ○ ● ● ● ● ● ● ● ● ●
2010/2/17 13:26:44 160   ● ● ● ● ● ● ● ● ● ●
2010/2/18 23:31:13 111               ○ ○ ● ●
2010/2/19 13:09:46 133           ○ ● ● ● ● ●
2010/2/20 0:11:10 140 T02 ● ● ● ● ● ● ○ ○    
2010/2/20 13:50:28 123   ● ● ● ● ○          
2010/2/21 23:54:04 145   ● ● ● ● ● ● ● ● ● ●
Created: September 2010
Last Modified: September 2010
Maintainer: YE Nan, Ye.Nan@monash.edu